THE BUILDER METHOD
Action-oriented educational approaches in architecture
THE BUILDER METHOD
Action-oriented educational approaches in architecture
Builder Matrix
Installation Manual
Datamap
Partners
Contact us
Builder Matrix
Installation Manual
Datamap
Partners
Contact us
Email Address
:
info@buildermethod.org
THE BUILDER METHOD
Action-oriented educational approaches in architecture
{{ gallery.swiper.realIndex + 1 }} / 8
Station mue
Time of building:
September 2018
Location of Built Project:
45.7371662,4.8175662
Environmental Setting:
wasteland
Function:
to rest, to gather, to play, to experiment, to educate, to socialize
Architectural Morphology:
Grid / Cubic, Organic / Free Form
Size:
750 m2
Time of building:
September 2018
Location of Built Project:
45.7371662,4.8175662
Environmental Setting:
wasteland
Function:
to rest, to gather, to play, to experiment, to educate, to socialize
Architectural Morphology:
Grid / Cubic, Organic / Free Form
Size:
750 m2
Materials:
wood
Preparations:
design, site visit, surveying, expert’s opinion, material acquisition, cost planning
Building time:
2 weeks - 1 month
Expected lifetime:
permanent (3 years or above)
Cost of Building:
160000
Funding:
100%
Client:
local public company (development planner)
List of Participants:
Concept Owner: Bruit du frigo
Show More
Show Less
Video
author's description
SIMILAR PROJECTS
Start a new search
Troppecolonne bar
Zarcola Architetti
Kiosquito
Bruit Du Frigo
La Mêlée
Bruit du frigo
Start a new search
Start a new search
Login
Field is required
Username must have at least 1 letters.
Field is required
Password must have at least 6 letters.
Remember
Forgot password?
Login
Forgot password?