THE BUILDER METHOD
Action-oriented educational approaches in architecture
THE BUILDER METHOD
Action-oriented educational approaches in architecture
Builder Matrix
Installation Manual
Datamap
Partners
Contact us
Builder Matrix
Installation Manual
Datamap
Partners
Contact us
Email Address
:
info@buildermethod.org
THE BUILDER METHOD
Action-oriented educational approaches in architecture
{{ gallery.swiper.realIndex + 1 }} / 5
La Mêlée
Time of building:
June 2019
Location of Built Project:
44.85436230000001,-0.5548509
Environmental Setting:
other
Function:
to shelter, to rest, to gather, to delimit a space, to showcase, to circulate, to experiment, to socialize
Architectural Morphology:
Grid / Cubic
Size:
XL (50 - 200 m2)
Time of building:
June 2019
Location of Built Project:
44.85436230000001,-0.5548509
Environmental Setting:
other
Function:
to shelter, to rest, to gather, to delimit a space, to showcase, to circulate, to experiment, to socialize
Architectural Morphology:
Grid / Cubic
Size:
XL (50 - 200 m2)
Materials:
wood
Preparations:
design, material acquisition, cost planning
Building time:
1 - 2 weeks
Expected lifetime:
temporary (0-1 month)
Cost of Building:
$$$ (5000-20000 USD)
Funding:
100% State aid
Client:
other
List of Participants:
Concept Owner: Bruit du frigo
Show More
Show Less
Video
author's description
SIMILAR PROJECTS
Start a new search
Troppecolonne bar
Zarcola Architetti
Kiosquito
Bruit Du Frigo
Station mue
Bruit du Frigo
Start a new search
Start a new search
Login
Field is required
Username must have at least 1 letters.
Field is required
Password must have at least 6 letters.
Remember
Forgot password?
Login
Forgot password?